Skip to content

Prefabrication, FAT, SAT and commissioning

We build machinery monitoring and protection system cabinets and test them before they are shipped to site.

Then we install, commission and verify them under real conditions. This way most of the work and testing is done before the machine outage.

Scope

What the service covers

We work to design documentation — our own or supplied by the client — and document the agreed stages in test records.

  • Cabinet prefabrication and wiring
  • Module and software configuration
  • Factory acceptance tests (FAT) with the client
  • Installation and connection on site
  • Site acceptance tests (SAT) and signal checks
  • Commissioning and support during machine start-up

When to call us

Typical situations

  • Short outage

    Site work has to be kept to a minimum.

  • New installation

    The system needs to be built, tested and commissioned.

  • Upgrade

    Replacing cabinets and modules in a system in service.

  • Formal acceptance

    The client or investor requires formal FAT and SAT.

  • Machine start-up

    Support needed for the first start-up.

  • Limited resources

    The in-house team has no time for prefabrication and testing.

Recognise one of these symptoms? An analyst will help find the cause.

Outcome

What you get

  • Ready cabinets

    Assembled, wired and configured before delivery.

  • FAT and SAT records

    Documented factory and site test results.

  • A commissioned system

    Verified signals, alarms and trip functions.

  • Documentation

    As-built documentation and system configuration.

Process

How we work together

  1. 01

    Request

    Documentation, scope, outage schedule.

  2. 02

    Prefabrication

    Cabinet assembly, wiring and configuration.

  3. 03

    FAT

    Factory tests to the agreed procedure.

  4. 04

    Installation and SAT

    Connection on site and site tests.

  5. 05

    Commissioning

    Start-up support, documentation handover.

Hydropower · 2025–2026

Protection system retrofit on a hydro unit

TAURON

  • Machinery protection systems
  • Prefabrication, FAT, SAT and commissioning
Read case study

Related projects

Frequently asked questions

Didn't find your answer? Ask an engineer →

What is the difference between FAT and SAT?

A FAT (factory acceptance test) checks the system before shipment, in workshop conditions. A SAT (site acceptance test) checks it after installation on site, with the real sensors and connections.

Can the client attend the FAT?

Yes. The test procedure is agreed in advance, and tests can be carried out with the client's or investor's representatives present.

Do you prefabricate to someone else's design?

Yes, after reviewing the documentation. Any comments on the design are raised before work starts.

Need a diagnosis or a quote?

Basic machine data and a short description are enough.