Then we install, commission and verify them under real conditions. This way most of the work and testing is done before the machine outage.
Scope
What the service covers
We work to design documentation — our own or supplied by the client — and document the agreed stages in test records.
- Cabinet prefabrication and wiring
- Module and software configuration
- Factory acceptance tests (FAT) with the client
- Installation and connection on site
- Site acceptance tests (SAT) and signal checks
- Commissioning and support during machine start-up
When to call us
Typical situations
Short outage
Site work has to be kept to a minimum.
New installation
The system needs to be built, tested and commissioned.
Upgrade
Replacing cabinets and modules in a system in service.
Formal acceptance
The client or investor requires formal FAT and SAT.
Machine start-up
Support needed for the first start-up.
Limited resources
The in-house team has no time for prefabrication and testing.
Recognise one of these symptoms? An analyst will help find the cause.
Outcome
What you get
Ready cabinets
Assembled, wired and configured before delivery.
FAT and SAT records
Documented factory and site test results.
A commissioned system
Verified signals, alarms and trip functions.
Documentation
As-built documentation and system configuration.
Process
How we work together
- 01
Request
Documentation, scope, outage schedule.
- 02
Prefabrication
Cabinet assembly, wiring and configuration.
- 03
FAT
Factory tests to the agreed procedure.
- 04
Installation and SAT
Connection on site and site tests.
- 05
Commissioning
Start-up support, documentation handover.
Projects
Related projects
2026
Dunamenti Erőmű, Százhalombatta · Hungary
Supply, installation and commissioning of an Orbit 60 monitoring system.
2026
ORLEN Lietuva, Mažeikiai refinery · Lithuania
Reciprocating compressors SK-301/302 in compressor house LK-1: Orbit 60 with System 1 Evolution installed, configured and SAT-tested.
2022
ANWIL, Włocławek · Poland
Wireless Ranger Pro monitoring and diagnostic system with System 1 software: supply and commissioning.
2021
ORLEN Lietuva, Mažeikiai refinery · Lithuania
Monitoring and diagnostic system for compressors SK-303 and SK-304: supply, installation and commissioning.
2018–2019
PGE Energia Odnawialna – Koniecwałd (Malbork) wind farm · Poland
2017–2018
PGE Energia Odnawialna – Kisielice wind farm · Poland
2017
Grupa LOTOS, Gdańsk refinery · Poland
Vibration measurement system for pump units: supply and commissioning.
2017
ORLEN Lietuva, Mažeikiai refinery · Lithuania
3500 monitoring for compressors IK-301 and IK-201: supply, installation, commissioning and System 1 integration.
Frequently asked questions
Didn't find your answer? Ask an engineer →
What is the difference between FAT and SAT?
A FAT (factory acceptance test) checks the system before shipment, in workshop conditions. A SAT (site acceptance test) checks it after installation on site, with the real sensors and connections.
Can the client attend the FAT?
Yes. The test procedure is agreed in advance, and tests can be carried out with the client's or investor's representatives present.
Do you prefabricate to someone else's design?
Yes, after reviewing the documentation. Any comments on the design are raised before work starts.
Need a diagnosis or a quote?
Basic machine data and a short description are enough.