Symptoms
Typical problems
High vibration at start-up
Passing through critical speeds, changes in start-up behaviour.
Axial position and expansion
Shifts in axial position and differential expansion.
Unbalance after an overhaul
Higher 1X vibration after work on the rotor.
Fluid-film bearing instability
Subsynchronous components, changing orbits.
Obsolete TSI system
No manufacturer support and no spare parts.
Services and parts
What we do
- 01
Protection systems and TSI
Continuous protection on vibration, axial position and speed.
- 02
Online condition monitoring
Trends and dynamic data from the running turbine-generator set.
- 03
Vibration diagnostics
Start-up and coast-down analysis, orbits and phase.
- 04
Machine balancing
On-site correction of unbalance.
- 05
Steam & gas turbine overhauls
Turbine inspections and overhauls with our partners.
- 06
Spare parts
Spare parts, blades and flow-path components.
- 07
Parts for LMZ turbines
Identifying and supplying parts for LMZ turbines in service.
Projects on this machine type
Power generation · 2025–2026
3500 system upgrade on a gas turbine
Budapesti Erőmű, Budapest
- Support for Bently Nevada systems
- Vibration sensors and measurement chains
- DCS / SCADA / OPC / Modbus integration
Power generation · 2024
Start-up vibration measurements after a turbine overhaul
Power plant, Hungary
- Vibration measurements
- Vibration diagnostics
Related projects
2026
Enefit Power – Auvere Power Plant · Estonia
Spare parts for the 3500 protection system of the ALSTOM turbine.
2026
PGE Energia Ciepła – Bydgoszcz CHP · Poland
Inspection of the Bently Nevada special measurement system on turbine set TG2.
2026
PGE Energia Ciepła – Gdańsk CHP · Poland
Inspection of the Bently Nevada special measurement system on turbine set TG3.
2026
Ignitis gamyba – Elektrėnai Power Plant · Lithuania
Unit 9: System 1 Classic migrated to System 1 Evolution, with hardware, software, configuration and tests.
2026
ORLEN Termika – Żerań and Siekierki CHP · Poland
Maintenance of the 3500 protection systems at both CHP plants under a frame agreement, ongoing since January 2026.
2026
ORLEN Termika – Żerań CHP · Poland
Assessment of the dynamic condition of turbine set TZ13 under the protection-systems frame agreement.
2026
ORLEN Termika – Siekierki CHP · Poland
Inspection of the Bently Nevada special measurement system on turbine set TZ8.
2026
Veolia Energia Poznań – Poznań CHP · Poland
Inspection of the Bently Nevada special measurement system on turbine set TG1.
Frequently asked questions
Didn't find your answer? Ask an engineer →
Do you upgrade TSI systems?
Yes. We prepare the upgrade concept and a migration plan that takes account of existing sensors, cabling and the available outage windows.
Do you take measurements during turbine start-up?
Yes. Start-up and coast-down analysis is one of the core diagnostic methods for turbine-generator sets with fluid-film bearings.
Need a diagnosis or a quote?
Basic machine data and a short description are enough.