Skip to content

Qualifications & references

Our team's qualifications and reference letters from clients.

Qualifications are listed in aggregate, without personal names. For tenders we provide copies of personal certificates on request.

Request certificate copies

Team

Team qualifications

  • Machinery monitoring and diagnostics

    Our engineers hold the following qualifications and manufacturer training:

    • Vibration analysis to ISO 18436‑2, Category III (Mobius Institute)

    • Machinery diagnostics — manufacturer training (Bently Nevada)Rotor dynamics, balancing principles, rubs, preloads and misalignment, fluid-induced instabilities, shaft cracks

    • Bently Nevada 3500 machinery protection system — maintenance

    • System 1 condition monitoring software (on-line and portable systems)Including Baker Hughes training

    • Orbit 60 — configuration and maintenance

    • Vibration diagnostics of centrifugal machines (basic course)

  • Control systems and automation (DCS / PLC / SIS)

    Our engineers hold training in:

    • Honeywell Experion PKS C200 / SCADA — troubleshooting and maintenance

    • Honeywell Safety Manager (SM) — maintenance

    • Siemens SIMATIC S7 — serviceSITRAIN

    • Siemens SIMATIC PCS 7SITRAIN

  • Electrical qualifications (SEP)

    Our engineers hold SEP qualification certificates, Group 1, for operation (E) and supervision (D), covering:

    • Electrical installations and equipment up to 1 kV

    • Electrical installations and equipment above 1 kV

    • Explosion-proof (Ex) electrical equipment

    • Control and measurement equipment, automatic control and protection systems

  • Infrared thermography

    Our engineers hold:

    • Thermographer, Level I (Infrared Training Center)

References

Reference letters

  • First page of the reference letter from SIA Ventamonjaks, Ventspils

    Latvia

    SIA Ventamonjaks, Ventspils

    Letter of 13 October 2021 · project 2018

    Confirms that in 2018 we successfully developed and implemented the replacement of the vibration monitoring system of the filling-cycle compressors at the Ventspils site.

    See the project

  • First page of the reference letter from AB Achema

    Lithuania

    AB Achema

    Letter of 25 February 2020 · project 2018

    Confirms that in 2018 we designed, manufactured and delivered the new rotor for steam turbine A‑4601 (shaft and blades, assembly, dynamic balancing, tests and documentation) properly and on time, and states Achema's intention to continue the cooperation.

    See the project

Full reference letters are available on request.