Project details
- Client
- Power plant, Hungary
- Industry
- Power generation
- Location
- Hungary
- Year
- 2024
- 01
Challenge
After an overhaul a turbine-generator set is started up under observation: this is when the quality of the repair shows. We were asked to measure vibration during the start-up.
- 02
Scope of work
- Vibration measurements during start-up after the overhaul
- Portable measuring system connected to the turbine set's measurement points
- Analysis of the recorded vibration data
- Identification of the cause of high vibration
- 03
Solution
We connected a portable measuring system and recorded vibration while the turbine set was run up after the overhaul. High vibration appeared at the bearing between the turbine and the generator.
Further analysis of the data showed that the cause lay in the shaft line: the turbine set was misaligned.
- 04
Results
- High vibration at the turbine–generator bearing recorded during the start-up
- Cause identified: shaft-line misalignment
- A clear direction for corrective work on the shaft line
Equipment and technologies
- Portable multi-channel vibration measuring system
Gallery
Measurement point at the generator end Signals taken from the existing monitoring racks